Greenley and the big 4 countdown


Friday, March 6, 2009

When its over in July



I can’t imagine our house renovation ever ending. The front room that we took the wall down in between the two rooms is moving along at a snails pace, we got the popcorn ceiling down it sounded easy but was hard and messy. Now we have to patch the hole’s running down both walls and floor where the old wall use to be. Somehow fix the gaping hole in the ceiling where the fireplace use to be, re-finish the hardwood floor, run new wire, put in new lighting fixtures, put in new plugs and switches, attempt to re-plaster the crappy old walls, put up molded ceiling tile, install crown molding, repair the baseboard gaps, paint walls, paint doors, paint crown molding, install the closet system. All before our little baby comes! It is so extremely stressful for me to think about. We NEED to get it done or the baby will be in our bedroom and that is impossible there is no room for her. I hope we can get it done Mike reassures me that it will get done but I remain optimistic we only have till July to get it done. We where planning on installing a bathroom but that has faded into our wish pile, we have the bathtub, sink, toilet all the stuff for a bathroom but plumbers are so expensive and we would rather save our money for when im not working and at home with the baby. Im sure it will all work out just fine. Mike never lets me down. But I will still stress until it's over it’s what I do best.

No comments: